            Pneumatic Pipeline Collection System for Intelligent Waste Classification Asked & Questions

            ——

             二維碼

                                                                                                                                                                                          

            Q1

            Quetion:

                What are the advantages of the system?

            Answer:

                The system has many advantages, mainly manifested in:
                1) The garbage stream is sealed and concealed during the transmission process, completely isolated from the crowd, and the community living environment is improved; the odor and odor caused by garbage and the mosquito, rat, and ant nuisance are eliminated, which greatly reduces the risk of disease transmission.
                2) Save valuable space: no special garbage storage room and garbage channel are needed, which greatly reduces the construction area occupied for garbage collection and transportation (about 1200 households can save about 2 households' construction area). The builder won more development area.
                3) Significantly reduce the cost of property operation: waste sorting and collection automation, avoiding the use of elevators to collect garbage, saving electricity costs and labor.
                4) Convenient and effective classification at the front-end drop-in port and drop-in station of the system, recycling all kinds of recyclable waste, reducing the total amount of non-recyclable waste, and using technology to recover the waste with reusable value to the greatest extent.
                5) It can run automatically 24/7 without being affected by natural weather.
                6) Reduced the entry and exit of outsiders, increased the value of the property, and showed the intimate, noble and modern of the community.
                7) Improving the construction grade and environmental protection image is in line with the development direction of "eco-environmental protection" communities. It is an additional item of green building certification at home and abroad.


                                                                                                                                                                                          

            Q2

            Quetion:

                Can the system be installed after purchase?
            Answer:

                No. The system needs to bury pipes in advance, so you need to communicate with the design department when designing, and you need to reserve the corresponding space. The sooner you use it, the more time and money you save.


                                                                                                                                                                                           

            Q3

            Quetion:

                System composition and working principle?

            Answer:

                The pneumatic automatic garbage collection system is composed of four parts: a sorting system, a pipeline system, a central garbage collection station, and a control system. The system's pipeline laying is similar to urban infrastructure such as water pipes, drainage pipes, and gas pipes.
                Normally, when residents place garbage through the indoor or outdoor discharge port, the garbage will be temporarily stored in the garbage storage section. When the sensor above the storage section senses that the garbage is full, the control system will start the vacuum exhaust fan in the collection station, and the fan will run. The generated negative-pressure airflow transports the garbage to the central collection station through a horizontal pipe at a speed of about 18-25 m / s per second, and then separates the garbage from the airflow that transports the garbage through a garbage separator. The airflow is then subjected to dust and deodorization treatment After reaching the national secondary gas emission standard, it is discharged out of the atmosphere, and the garbage is compacted and introduced into a sealed garbage container. Recyclable garbage is sold or reused on-site. Non-recyclable garbage is transported to the landfill by sanitation trucks. Landfill or incineration plant for final disposal.


                                                                                                                                                                                          

            Q4

            Quetion:

                What is the service radius of the system?

            Answer:

                Theoretically, the service radius R can be very large, just like the water pipe, which can cover the whole city. However, in terms of energy efficiency and cost performance, the service radius of the fully-automatic closed pneumatic conveying system is more suitable and economical between 2.0 ~ 3.0km.


                                                                                                                                                                                           

            Q5

            Quetion:

                What is the negative pressure (vacuum degree) of the system operation?

            Answer:

                The transmission pressure and vacuum degree of the system is about -35kPa ± 5kPa.


                                                                                                                                                                                           

            Q6

            Quetion:

                What is the flow rate of garbage in the vacuum pipe?

            Answer:

                Usually, the transmission speed is V = 18m / s ~ 26m / s, and it should be designed and selected according to the type of garbage and the condition of the pipe network.


                                                                                                                                                                                           

            Q7

            Quetion:

                Does the corresponding delivery port of the system have traceability?

            Answer:

                Peakway fifth-generation delivery system (5G) is equipped with traceability modules such as credit card and face, both indoor and outdoor, which can clearly record the publisher ’s behavior and history and save it to the cloud.


                                                                                                                                                                                           

            Q8

            Quetion:

                Can the system's drop port measure the waste?

            Answer:

                Peakway fifth-generation delivery system (5G) 's indoor and outdoor delivery ports are also equipped with weighing or capacity measurement modules. After the user puts them in, the amount can be put or saved and instantly saved to the cloud.


                                                                                                                                                                                           

            Q9

            Quetion:

                Can the system reward spamming behavior?

            Answer:

                Peakway fifth-generation delivery system (5G) comes with a reward module and a charging module and procedures. The property can be rewarded or charged according to local or community policies, such as rewarding users who place recyclable waste, which is harmful for the corresponding release. Trash users are charged, which can be done with third-party QR codes such as WeChat and Alipay, and the charging and payment behaviors are saved to the cloud instantly.


                                                                                                                                                                                           

            Q10

            Quetion:
                How much investment does the system require?
            Answer:
                If the fifth-generation Peakway system that can complete the four types of garbage collection is used, taking about 1,000 residential areas as an example, the construction cost is about 10,000 to 13,000 yuan per household; the construction cost per square meter of building area is about 100 ~ 120 yuan. And the larger the number of households in a single community, the lower the construction cost of a single household; the larger the construction area, the lower the construction cost per unit area.
            Commercial complexes, hospitals, hotels, ecological towns, low-carbon parks and other unit costs are about 70% of the residential area.
            A more accurate quotation plan can only be obtained after the professional engineers of Peakway have assisted in designing the corresponding project.


                                                                                                                                                                                           

            Q11

            Quetion:
                How much does the system collect per ton of garbage?

            Answer:
                According to the current average electricity price and operation and maintenance costs of large cities in China, the cost of garbage collection per ton is about 50 ~ 80 yuan, which is 25% ~ 35% of the traditional reliance on manual collection and transfer.


                                                                                                                                                                                           

            Q12

            Quetion:
                How does the system sort waste? How to dispose of the collected recyclable garbage?

            Answer:
                The front end of the Peakway system can be equipped with a fifth-generation sorting port (5G), which can guide users to sort waste more accurately; the trash (paper, plastic, cans, etc.) collected by the vacuum pipe to the sorting bin is relatively pure It can be regularly sold to waste recycling companies at high prices, and then used as resources to collect waste into treasure.


                                                                                                                                                                                           

            Q13

            Quetion:
                Will garbage get stuck in the pipes? What if it gets blocked?

            Answer:
                Will not block, as follows:
                1) Scientific and reasonable pipeline design greatly reduces the resistance and blockage of garbage transmission. When designing the system, Peakway engineers fully considered the resistance along the entire pipeline network system, and matched the parameters of the size of the horizontal transmission pipeline, the radius of curvature, and the speed of the garbage during the transfer process to the entire system. It is guaranteed not to be clogged, and to achieve the best energy efficiency ratio of garbage collection. It is designed to ensure that garbage will not be blocked in the pipeline.
                2) When the Peakway system is working, the transportation speed of garbage in the pipeline is as high as 20m / s ~ 30m / s, and the inner wall of the pipeline is always flushed continuously. The longer the use time, the smoother the inner wall of the pipeline and the smaller the resistance.
                3) Peakway's various openings have the function of limiting the size of garbage. Large-size refuse cannot be put in. The maximum diameter of the garbage that can be accommodated by the opening is always smaller than the diameter of vertical and horizontal pipes. Garbage can enter the garbage pipe network smoothly; the diameter of the garbage pipe network from the end to the main pipe is getting larger and larger, and it can pass through the main branch pipe to pass the main pipe and main pipe to the garbage bin of the central waste station.
                4) Judging from the projects that have been applied to foreign central waste pipeline collection systems, there are very few clogging accidents under normal use.
            If the force majeure or human factors cause the clogging of garbage, the problem of clogging garbage in the pipeline will also be easily removed from the sensors and service ports installed on the pipe network.


                                                                                                                                                                                           

            Q14

            Quetion:
                Will the garbage stick to the inner wall of the pipe?


            Answer:

                Will not.

                The speed of garbage transmission in the horizontal transmission pipe network is very fast, usually reaching 70km / h, and it is difficult for the inner wall of the pipeline to leave garbage.

                Domestic garbage is made up of a variety of ingredients and is transported at high speed in the pipeline, which itself plays a role in cleaning the inner wall of the pipeline.The pipeline uses SMART CHUTE, which is generally a plug-in method, and the inner surface connection is smooth; the welding parts used also have strict requirements during construction to ensure the smoothness of the inner wall. Prevent garbage from hanging on the wall.    

                For vertical transmission pipelines, SMART CHUTE pipelines are also used to ensure that the inner surface connection is smooth. At the same time, the vertical surface of the vertical pipeline is cleaned by a cleaning device.


                                                                                                                                                                                           

            Q15

            Quetion:
                Is there noise during the transfer of garbage?

            Answer:
                Will not.
                The vertical garbage pipes leading to each floor are covered with muffler cotton and installed in pipe wells; the horizontal garbage transfer pipes leading to the central garbage station are also covered with sound-absorbing and anticorrosive layers, and are laid in the underground or buried ground.


                                                                                                                                                                                           

            Q16

            Quetion:
                How much area does the central waste station need?
            Answer:
                For a residential area with a resident population of less than 10,000 people (approximately 2,000 to 2,300 households) and a standard plot ratio, the area of the central garbage station is approximately 150 to 200 m2.
                The central waste station of the Peakway waste sorting vacuum pipe collection system mainly includes: a vacuum extraction main room, a dust removal and deodorization room, no less than 4 sets of classified waste compression boxes, 4 sets of transfer boxes, compressed air rooms, power distribution rooms, Control room, etc. The area of the central waste station will vary according to the number of residents and service radius.


                                                                                                                                                                                           

            Q17

            Quetion:
                How much headroom is required to install a vacuum extraction main engine room?

            Answer:
                It usually takes about 3.8 ~ 4.5m. For the space that is too low, Peakway engineers carry out non-standard design after site survey to try to meet the existing space.


                                                                                                                                                                                           

            Q18

            Quetion:
                Where is the general choice for the vacuum extraction host room?

            Answer:
                Generally, the basement of a residential district or commercial building is selected, and the appropriate location on the ground can also be selected, depending on the specific situation of the community or building.


                                                                                                                                                                                           

            Q19

            Quetion:
                How to effectively control the odor of exhaust gas from the host of the central waste station?

            Answer:
                Will not.
                The exhaust gas discharged by the vacuum host is sequentially discharged into the first-level bag dust removal system and the second-level activated carbon system for filtering and discharge, which meets the national emission standards. For a small amount of odor remaining in the vertical garbage pipe, the exhaust fan installed on the roof is filtered and discharged to the atmosphere. The exhaust fan is provided with a junior and intermediate efficiency filter and an activated carbon filter.


                                                                                                                                                                                           

            Q20

            Quetion:
                Does the developer need to purchase the dustbin transporter? What are the specifications?

            Answer:
                No need. Peakway's engineers will select the existing garbage transport vehicles (loads 4 tons, 6 tons, 8 tons) of the local municipal or city management department according to the location and space size of the central garbage room, the height of the central garbage room to the main road, etc Etc.), different garbage bins will be designed according to the specifications of local garbage trucks.


                                                                                                                                                                                           

            Q21

            Quetion:

            Can the Peakway system be retrofitted to existing residential quarters or buildings?

            Answer:

            Absolutely okay. The garbage pipeline is a negative pressure pipeline, and the garbage transported is not flammable, explosive or corrosive. The negative pressure transmission will not seep any substance. The garbage transmission pipeline is a negative pressure pipeline, which is easy to install and is not affected by terrain. The impact can be buried or installed directly, and the low-level garbage can be pumped to a high level, that is, "the garbage can flow to a high level".

            Twenty years ago, most communities in many small and medium-sized cities in China did not have natural gas pipelines. Later, natural gas pipelines with positive pressure and certain hidden dangers were installed. It is easier to install garbage collection pipelines. With funds, you can complete the installation of waste separation and collection pipelines.


                                                                                                                                                                                           

            Q22

            Quetion:

            What are the characteristics of Peakway system compared to other systems in the industry?

            Answer:

            The Puhui system is a revolutionary change in the garbage collection and transportation and resource utilization system. It is not just a pipeline collection. The front-end is equipped with an advanced 5th generation intelligent sorting system. The SMART CHUTE system is used in the middle. Configure resources and use the system locally; the system is equipped with the unique Peakway PHAT monitoring system, which is user-friendly, and the interface is simple and intuitive; the central control system organically combines automation, intelligence, and cloud storage, automated operation, remote monitoring , High collection and transportation efficiency, low energy consumption per unit of garbage collection.

            Peakway innovatively put forward and practiced the ecological closed-loop concept of the "regional and distributed classification, collection and resource utilization of garbage" package: garbage can be finely classified, various recyclable garbage can be sold and effectively followed up Recycling; organic waste that cannot be sold can be pyrolyzed or pyrolyzed at the central waste station to minimize the amount of waste transported out of the community (producing area), thereby greatly reducing municipal transportation, reducing incineration and filling, and Beneficial to community, environment, society and local government.


                                                                                                                                                                                           

            Q23

            Quetion:

            How do I get help for other system related issues?

            Answer:

            Please call Peakway marketing department or technology and engineering department during working hours, or leave a message on Peakway official website Baidu Shangqiao.

            The contact number of Peakway China Headquarters: + 86-20-37655883, + 86-4008001488.


                                                                                                                                                                                          


            :

            :

            :

            :

            :

            :

            :

            :

            :

            :

            :

            :

            :

            :

            分享到
            上一篇
            下一篇

            Product

            We treat each project from the perspective of customer needs

            ——
            <sub id="pzhzb"><font id="pzhzb"></font></sub>
                <sub id="pzhzb"><dfn id="pzhzb"></dfn></sub>

                <form id="pzhzb"><form id="pzhzb"><noframes id="pzhzb">

                <track id="pzhzb"><dfn id="pzhzb"><listing id="pzhzb"></listing></dfn></track>

                <p id="pzhzb"></p>

                <output id="pzhzb"><sub id="pzhzb"><noframes id="pzhzb">

                  <progress id="pzhzb"><menuitem id="pzhzb"><big id="pzhzb"></big></menuitem></progress>

                      欧美变态另类牲交zozo_美女视频图片_国产午夜免费视频秋霞影院_无遮挡又黄又刺激的视频 Powered by CmsEasy